In The News

Army Corps Of Engineers Aims To Get Baltimore Key Bridge Cleared By End Of May

The U.S. Army Corps of Engineers (USACE) said it hopes to fully clear the wreckage of the Francis Scott Key Bridge by the end of May in a statement Thursday, allowing vessels access the Port of Baltimore just over two months after a cargo ship crashed into one of the supports, crumbling the bridge.

USACE has been working under a unified command with the U.S. Coast Guard and state agencies to survey the wreckage and develop plans to clear the waterway after the boxship M/V Dali demolished a section of the bridge and collapsed it into the waters on March 26, according to the statement. Engineers determined they could clear out a limited access passage within a month to permit limited one-way barge traffic in and out of the port while efforts would remain underway to open the channel fully.

“Thanks to the exhaustive work of the Unified Command during the last two weeks, including underwater surveys and detailed structural analysis of the wreckage, we’ve developed a better understanding of the immense and complex work that lies ahead,” Lt. Gen. Scott A. Spellmon, USACE commanding general, said in the statement. “A fully opened federal channel remains our primary goal, and we will carry out this work with care and precision, with safety as our chief priority.”

The news is a significant update as stormy weather near the harbor has complicated cleanup activities, the Unified Command said.

Authorities say the channel is critical for local and national economic activities, according to CNN. Eleven cargo ships, including four belonging to the U.S. Maritime Administration’s Ready Reserve Force built to deploy at a moment’s notice to support U.S. military forces abroad, are trapped in port, according to Stars and Stripes.

The provisional channel will be about 280 feet wide and 35 feet deep, and allow limited one-way traffic for barge container ships and some roll on/roll off vessels carrying large items like automobiles and farm equipment, USACE said in the statement.

“USACE engineers are aiming to reopen the permanent, 700-foot-wide by 50-foot-deep federal navigation channel by the end of May, restoring port access to normal capacity,” the statement read.

USACE authorities acknowledged that the timeline for reopening the channel is “ambitious.” Inclement weather and unforeseen engineering difficulties could extend projections, Spellmon said.

Six construction workers died in the bridge collapse, and officials are still trying to locate four of the bodies, according to CNN. President Joe Biden will visit the site of the bridge collapse on Friday and meet with families of the deceased.

Content created by The Daily Caller News Foundation is available without charge to any eligible news publisher that can provide a large audience. For licensing opportunities of our original content, please contact licensing@dailycallernewsfoundation.org

Micaela Burrow

Share
Published by
Micaela Burrow

Recent Posts

Forget Lack of Respect, this is Pure Hatred and Ignorance

Forget Lack of Respect, This is Pure Hatred and Ignorance. The scenes are horrific. If…

3 hours ago

New Iran War Fears Send Oil Past $105 With Diesel Already Sky High

Oil prices jumped Thursday as President Donald Trump weighs whether to restart large-scale strikes on…

3 hours ago

EPA Wants To Scrap Biden-Era Regs That Pose ‘Monumental Threat’ To American Methane

The Trump administration is preparing to scrap another Biden-era climate regulation, taking aim at a…

3 hours ago

Starting Line: Hospital vs. Fortress. The Christian line begins in bankruptcy

Before a faith responds to the feed, the algorithm, or the machine, it makes a…

3 hours ago

US Navy Moves To Build New Tomahawk Missile That Comes With Unknown Price Tag

The U.S. Navy is preparing to manufacture a new bunker-busting version of its Tomahawk cruise…

3 hours ago

Caught

12 hours ago